MARINE ELECTRIFICATION INTERFACE BRIEF The Waterfront Brief https://waterfrontbrief.com/marine-electrification/ Use this worksheet to prepare a project conversation. The prompts are an editorial starting point; agree actual scope and professional responsibilities with the appropriate team. 1. Project function: at-berth auxiliary supply, propulsion charging, or both Notes: 2. Service pattern, routes, berth visits, and usable connection windows Notes: 3. Vessel energy and load inputs, with their evidence and technical owner Notes: 4. Terminal space, access, equipment, and operating interfaces Notes: 5. Utility contact, connection process, supply assumptions, and lead-time evidence Notes: 6. Alternatives, operating costs, and uncertainty to evaluate Notes: 7. Supplier, technical, workforce, and maintenance responsibilities Notes: 8. Testing, acceptance evidence, transition sequence, and unresolved decisions Notes: Open decisions and owner: Evidence needed before the next decision: Prepared by: Date: